Starting with a comprehensive inspection of your property, CWI will strive to identify the cause of structural and water intrusion issues. With an in-depth understanding of your building’s exterior, CWI can develop and execute an effective repair scope of work.
The historic hotel was built in 1927 in the heart of Washington's North West quadrant.
View ProjectThe Ritz-Carlton, Tysons Corner is One of the most prestigious Luxury Hotels in Northern Virginia: waterproofing and masonry repairs.
View ProjectThe Four Seasons Hotel and One Logan Square: Fountain repair and waterproofing.
View ProjectThe Richmond Marriott is a high-rise hotel located in downtown Richmond. CWI removed and replaced window sealants and glazing, and replaced solarium roofs.
View ProjectExterior caulking; sealer installed on precast concrete façade.
View Project100% removal and replacement of exterior caulking. Elastomeric coatings installed on precast panels. Urethane deck coating system installed on parking decks.
View ProjectParking deck repair. Concrete balcony deck restoration. Balcony slider replacement (all).
View ProjectThe Belvedere is a masonry and concrete twin tower high-rise condominium. The towers unique design offered a rigging challenge. CWI performed masonry and concrete repairs along with coating the concrete and sealant replacement.
View ProjectCWI performed sealant replacement, masonry repairs, EIFS repairs and coatings and balcony railing replacement.
View ProjectTide Point is the former Procter & Gamble Soap Factory. CWI has performed masonry and concrete repairs, concrete coatings, sealant replacement and building wall flashing replacement.
View ProjectThe Flour Mill Condominium is a masonry mid rise condominium located in the heart of historic Georgetown. CWI removed and replaced the terraces waterproofing and pavers, and performed sealant, brick and mortar replacement.
View ProjectThe National Press Building is a high-rise office building. CWI performed sealant replacement.
View ProjectCWI performed masonry repairs, sealant replacement, balcony concrete repairs, balcony coating and railing replacement, and façade coating.
View ProjectCWI performed a complete plaza restoration project including removal of existing brick pavers and concrete topping slab, replacement of existing planter and plaza waterproofing and the installation of new precast pavers.
View ProjectCWI waterproofed the roof top helipad, and performed sealant and masonry repairs to the building façade.
View ProjectCWI performed masonry repairs, concrete repairs, sealant and expansion joint replacement.
View ProjectHistoric stone repair, exterior caulking and pointing, below grade waterproofing.
View ProjectPrecast and window perimeter caulking. Installation of 2-coat elastomeric system on precast.
View ProjectThe Canal House is a 300' four-story masonry structure located in Historic Georgetown that predates 1838. The Canal House was originally designed and used as a tobacco warehouse that opened up directly onto the Chesapeake & Ohio Canal (C&O).
View ProjectThe Towers at Harbor Court consists of three towers rising to twenty-nine stories with a total of 166 residences. Towers at Harbor Court is located right across from the Baltimore inner harbor.
View ProjectSentinel At Landmark is a fully occupied twelve story condominium. Work included installing preformed silicone extrusions to all sealant joints on the front elevation, EIFS repairs and coating. Additional work included concrete repairs to the façade of the building and parking garages.
View ProjectWebster House is a fully occupied 9 story masonry condominium located in the North West section of Washington, D.C... Work performed included over 7,500 lineal feet of through wall flashing replacement at the window heads, window sills and floor slabs.
View ProjectWoodlake Towers Condominium is located in the Seven Corners area of Falls Church, Virginia. The condominium consists of three high-rise buildings. CWI performed balcony rail replacement and deck restoration and coating on 234 balconies. All work was performed while the building was fully occupied.
View Project